TIRZEPATIDE Vial 30 mg TIRZEPATIDE Vial 30 mg TIRZEPATIDE Vial 30 mg
45PRIME

TIRZEPATIDE Vial 30 mg

0.0

The first peptide that acts on two hormones at the same time. · Vial 30 mg

SKU: PEP-030

Product QR code
Share: WhatsApp
The first peptide that acts on two hormones at the same time.

While Semaglutide mimics a single hormone, Tirzepatide was designed to activate two natural systems in the body. This is one of the reasons it has generated so much interest in metabolism research.

What is it?
Tirzepatide is a peptide that mimics the action of two natural hormones:
• GLP-1
• GIP Both are involved in how the body responds after eating.
In short:
• It helps to reinforce two natural signals related to appetite, glucose, and metabolism.

How does it work?
After each meal, your body releases different hormones to manage what happens with nutrients.
Tirzepatide activates two of those pathways at the same time.
It's like having two assistants working together instead of just one.

What is science researching?
• Appetite regulation
• Body weight management
• Type 2 Diabetes
• Cardiovascular health
• Energy metabolism

What results have studies observed?
Research has reported trends such as:
• Increased feeling of fullness.
• Decreased appetite.
• Better glucose control in people with type 2 diabetes within studies.
• Changes in body weight when accompanied by healthy eating and physical activity.
Results may vary between individuals.
What makes Tirzepatide different?
Its main difference is that it activates two receptors.
GLP-1 Helps regulate appetite and glucose.
GIP Participates in the body's response after eating and continues to be researched for its potential role in metabolism.
The combination of both pathways has made Tirzepatide one of the most studied compounds in recent years.

What does it NOT do?
• It does not directly burn fat.
• It does not replace good nutrition.
• It does not substitute exercise.
• It does not offer guaranteed results.

Why are so many people talking about it?
Because it was the first peptide approved for certain indications that combines the action on GLP-1 and GIP, marking a significant advance in the research of metabolic diseases.

Interesting fact
• Your body produces both GLP-1 and GIP every time you eat.
Tirzepatide was designed to leverage both natural signals in a single compound.

Is this peptide for you?
If you are interested in learning about:
• Appetite regulation.
• Metabolism.
• Type 2 Diabetes.
• Research on obesity.
• Digestive hormones.
Tirzepatide is one of the most relevant peptides to start with.

Did you know?
Tirzepatide was the first peptide of its kind to combine the activation of GLP-1 and GIP receptors in a single molecule. This design has propelled a new generation of metabolism research and has served as a basis for the development of even more advanced compounds, such as Retatrutide, which incorporates a third hormonal pathway.

Product intended for research use only (For Research Use Only). The information is educational and does not constitute medical advice, diagnosis, or treatment.

Specifications

SKU PEP-030
Brand 45PRIME
Unit of measure UNIDAD
Category Metabolism
Type Dual agonist (GLP-1 / GIP)
Function It mimics two natural hormones related to metabolism
Main research area Appetite, glucose, and body weight
State Widely studied in clinical research
Presentation Vial 5 mg
Categories WEIGHT LOSS

There are no reviews for this product yet.

Write your review

Sign in to leave a review.

There are no questions about this product yet. Be the first to ask!

Sign in to ask a question about this product.

Work out the concentration and how many units to draw on the syringe for the water you add.

mg
ml

Research use only. This tool merely calculates the dilution from the figures you enter: it is not a dose recommendation or a use indication.